WebMay 1, 2007 · The updated data sheet is available at no cost at www.roofnav.com along with updates to FM 1-28, "Design Wind Loads," and FM 1-52, "Field Uplift Tests." Second, the article states FM Global recommends design wind loads up to 49 percent greater than those stated in ASCE 7-05, "Minimum Design Loads for Buildings and Other Structures." ... Web2. Securement of roof-mounted solar photovoltaic (PV) modules; see DS 1-15. For wind design of other roof-mounted equipment, see DS 1-28,Wind Design. 3. Wind loads on panel roof systems; see DS 1-28,Wind Design. 4. Fire-related concerns for skylights; see DS 1-57,Plastics in Construction. 5.
DS 1-28 Design Wind Loads (Data Sheet) - Studylib
WebJul 1, 2012 · The wind speeds are peak gusts measured 33 feet above grade in open terrain. Basic wind speed, along with an importance factor (based on the building's occupancy), is used to determine design wind-load pressures. In ASCE 7-05, the wind-load factor for ASD is 1.0, so the design wind-load pressures are multiplied by 1.0. Web• FM 1‐28 (new) generally results in higher wind loads than FM 1‐28 (old) and ASCE 7‐16 • Different roof system attachment patterns may apply to Zone 1’ and Zone 1 • Be aware … how do i deactivate a facebook page
Understanding Wind Uplift Ratings Roofing Contractor
WebFM 1-28 now uses pressure coefficients and zone dimensions based on ASCE 7-16, “Minimum Design Loads and Associ-ated Criteria for Buildings and Other Structures.” How-ever, FM 1-28 does not use ASCE 7-16’s wind maps and basic wind speeds. Instead, FM 1-28 uses wind maps and basic wind speeds based on ASCE 7-05. Also, FM 1-28 and WebAn assembly that has received a 1-60 rating would have resisted a sustained pressure of 60 psf (2.87 kPa) for 60 seconds. Because FM applies a safety factor of two to the tested … WebASCE 7-16’s ASD values (IBC 2024). Using FM 1-28 typically results in higher design wind loads. Complying with the code is a minimum legal requirement. •Where FM 1-28’s values are lower, use of the code’s required wind loads is recommended •Where FM 1-28’s values are higher, these may be a project-specific contract requirement 19 how much is pet training at petsmart